KBB Exhibition March 2014 NEC

This one nearly got away from us! Our client (The Bathroom Manufacturers Association based at Keele) had a traditional shell scheme at The KBB Show at the Birmingham NEC. This is a wooden structure with plywood walls. We decided that the best way to put graphics onto the shell scheme would be to print onto digital wallpaper and have our team install the graphics on site. We were given the sizes of each of the stand walls and produced the graphics to suit – or so we thought. Unfortunately, the stand contractors built 2 of the 3 shell scheme walls the wrong size so none of the graphics would fit. Thanks to the expertise and patience of our fitters, Rob and Ian, the fit was completed at 8 o’clock on Friday night.

The clients are delighted at the result, despite the numerous phone calls on Friday afternoon, trying to resolve the badly built stand.